Keystone Exteriors of OceansideGet matched with vetted Oceanside roofers in minutes.(760) 276-7569Free estimate

Guide

The maintenance that actually matters

Most of what shortens a roof is neglect of things that take twenty minutes: a blocked valley, a lifted flashing, a gutter full of grit.

Or call (760) 276-7569
Guide7 sections1 min readOceanside, CA

Get it looked at

Three questions, and up to three Oceanside contractors. Free either way.

Or call (760) 276-7569

Free estimate · No obligation

Get it looked at

Three questions, and up to three Oceanside contractors. Free either way.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free. You are not committing to anything.

Look in the attic after heavy weather

The attic shows a leak long before the ceiling does. After any serious storm, take a torch up and look at the underside of the deck around penetrations and valleys.

Cut back anything touching the roof

Overhanging limbs cause three problems at once: abrasion, permanent shade that keeps a slope damp, and a highway for rodents into the attic.

Keep the penetrations honest

Pipe boots crack, sealant shrinks, and satellite mounts get screwed straight through the covering. Every penetration is a hole somebody decided to make watertight, and each is worth a look.

Twice a year, from the ground

Walk the perimeter with binoculars if you have them. You are looking for missing or lifted material, dark patches, sagging lines, and anything growing where it should not be. Ten minutes, twice a year.

Deal with growth properly

Moss and algae hold water against the surface. Treat and brush gently, or fit zinc or copper strip near the ridge. Never pressure wash an asphalt roof — it strips the granules and takes years off it in an afternoon.

Clear the gutters before the wet season

Gutters full of grit are not just a drainage problem — the grit is your roof, and its presence tells you something about how far along the covering is.

In short

Put two dates in the calendar, one either side of November through March. That is the whole programme.

Related questions

What if the decking is rotten underneath?

Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.

Can I stay in the house while it is done?

Yes, though it is loud, and things will fall off shelves in the garage. Move cars out of the driveway and take anything fragile off the walls of the top floor.

It is leaking right now. What do I do?

Move what you can out of the way, put a bucket under it, and if there is a bulge in the ceiling put a small hole at its lowest point to let the water out in one place rather than bringing the whole panel down. Then mark your request as an emergency — those go out first.

Ready for a real number?

No cost, no obligation, and never more than three contractors.

(760) 276-7569Call nowFree estimate